Thermal breaks are the missing links in continuous insulation
For a very long time, heat loss within buildings—the outcome of thermodynamic interactions when the heated inner and cold outer air collide—was considered as an unavoidable part of architectural construction.
Ultra-high strength polyurethane can control heat loss through steel framing
In the building and architectural sectors, steel framing has long been widely used. In fact, steel frames make up more than 70% of all multi-storey non-domestic frame building in the UK.
Armatherm’s 2023/24 Exhibitor Events…
Thermal break specialists, Armatherm™, will be attending London Build Expo to showcase its range of innovative thermal bridge solutions to the construction industry.
One of the leading suppliers of thermal break exhibits at London Build Expo 2022
Thermal break specialists, Armatherm™, will be attending London Build Expo to showcase its range of innovative thermal bridge solutions to the construction industry.
Armatherm achieves Passivhaus Column Base certificate
The majority of commercial buildings are designed with a flat roof, offering extra space for equipment such as HVAC units, roof screens and solar panels. Although this structure can provide extra space for these systems, the way in which the supporting elements that pass through the roof are connected to avoid energy transfer isn’t always considered.
How to make flat roof systems energy efficient
The majority of commercial buildings are designed with a flat roof, offering extra space for equipment such as HVAC units, roof screens and solar panels. Although this structure can provide extra space for these systems, the way in which the supporting elements that pass through the roof are connected to avoid energy transfer isn’t always considered.
Armatherm™ partners with Hanley Wood offering thermal bridging webinar
Armatherm™ has partnered with Hanley Wood to offer an informative webinar on the subject of thermal bridging. Developed to educate architects, this will provide an opportunity to earn important CEU credits, necessary to continue practicing within the architectural profession.
Armatherm, Running On The Sun
Armatherm and Armadillo NV are pleased to announce that as of November 1st, 2017 the companies have relocated. The nearly 8,000 square foot facility is located at 1 Titleist Drive, Acushnet, MA 02743.
No Results Found
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
Need help?
Contact us today to find out more or request a quote.
Contact Armatherm™
Armatherm Thermal Bridging Solutions Ltd, Hillam Road, Bradford, BD2 1QN
01274 591 115
© 2022 COPYRIGHT ARMATHERM™ ALL RIGHTS RESERVED