Armatherm Boosts Efficiency at Framingham University
What Was the Goal of the Framingham State Ballroom Expansion?
Framingham State University aimed to expand the Warren Conference Center with a new 10,800-square-foot ballroom, focusing on energy efficiency and sustainable design. Lavallee Brensinger Architects, led by project architect Jason Bennett, were tasked with incorporating a thermal break solution to maintain continuous insulation from the footing through the foundation slab to the masonry wall. This was essential for supporting the structural load while enhancing the building’s thermal performance.
What Thermal Challenges Did the Project Face?
The challenge was to ensure continuous insulation without compromising structural integrity. To address this, Armatherm 500-200 (UK equivalent 500 – 320) material was chosen for its superior load-bearing capacity and thermal performance. Positioned at the base of the brick wall, Armatherm 500-200 (UK equivalent 500 – 320) provided an uninterrupted thermal barrier.
How Did Armatherm Improve the Construction Process?
This material’s ease of use was noted by the masons, Marmelo Brothers, who found it straightforward to work with, thus streamlining the construction process and ensuring precise installation.

What Impact Did Armatherm Have on Energy Efficiency and Sustainability?
Overall, the use of Armatherm 500-200 (UK equivalent 500 – 320 ) in the project not only helped achieve the desired energy efficiency goals but also facilitated a smoother construction process, contributing to the project’s sustainability and efficiency (Armatherm).

Other Articles
& Projects
Armatherm™ Helps Scottish School Achieve Passivhaus Standards
Sustainable Design Build Solutions for Commercial Construction
Insulation Cladding Fabrication for New Build Schemes
New Thermally Isolated Compression Sleeve for Reducing Thermal Bridging in Façade Fixings
High Performance Thermal Insulation for Structural Building Applications
Addressing Thermal Bridging in Retrofit Projects
Specifying the right material to meet legislations in modern construction
Armatherm upcoming events in 2025
Armatherm announces expansion with the opening of a third office
Solving Thermal Bridging Challenges with Armatherm™