What Was the Goal of the Framingham State Ballroom Expansion?

Framingham State University aimed to expand the Warren Conference Center with a new 10,800-square-foot ballroom, focusing on energy efficiency and sustainable design. Lavallee Brensinger Architects, led by project architect Jason Bennett, were tasked with incorporating a thermal break solution to maintain continuous insulation from the footing through the foundation slab to the masonry wall. This was essential for supporting the structural load while enhancing the building’s thermal performance.

What Thermal Challenges Did the Project Face?

The challenge was to ensure continuous insulation without compromising structural integrity. To address this, Armatherm 500-200 (UK equivalent 500 – 320) material was chosen for its superior load-bearing capacity and thermal performance. Positioned at the base of the brick wall, Armatherm 500-200 (UK equivalent 500 – 320) provided an uninterrupted thermal barrier.

How Did Armatherm Improve the Construction Process?

This material’s ease of use was noted by the masons, Marmelo Brothers, who found it straightforward to work with, thus streamlining the construction process and ensuring precise installation​.

Framingham project featuring Armatherm solutions

What Impact Did Armatherm Have on Energy Efficiency and Sustainability?

Overall, the use of Armatherm 500-200 (UK equivalent 500 – 320 ) in the project not only helped achieve the desired energy efficiency goals but also facilitated a smoother construction process, contributing to the project’s sustainability and efficiency​ (Armatherm)​.

A worker cementing an area in a thermal break construction site.

Other Articles
& Projects

Armatherm Thermal Break Articles

Armatherm™ Helps Scottish School Achieve Passivhaus Standards

Aerial view of Currie Community High School in Edinburgh, where Armatherm 500 was used to improve energy efficiency and support Passivhaus school design
Armatherm Thermal Break Articles

Sustainable Design Build Solutions for Commercial Construction

Person holding a tablet displaying a building energy efficiency rating used to assess sustainable commercial building performance
Armatherm Thermal Break Articles

Insulation Cladding Fabrication for New Build Schemes

Modern residential new build housing development designed with insulated façade systems to support thermal performance and energy efficiency
Armatherm Thermal Break Articles

New Thermally Isolated Compression Sleeve for Reducing Thermal Bridging in Façade Fixings

Installed Armatherm thermally isolated compression sleeve preventing thermal bridging at structural connections within the building envelope
Armatherm Thermal Break Articles

High Performance Thermal Insulation for Structural Building Applications

Installation of rigid thermal insulation on a structural masonry wall to improve building envelope performance and reduce thermal bridging
Armatherm Thermal Break Articles

Addressing Thermal Bridging in Retrofit Projects

Historic domed building surrounded by scaffolding during restoration work, with a large construction crane beside it.
Armatherm Thermal Break Articles

Specifying the right material to meet legislations in modern construction

Tablet showing a compliance workflow diagram with terms like regulations, standards, and risk, held in front of a live construction site with scaffolding and a hi-vis worker in the background.
Armatherm Thermal Break Articles

Armatherm upcoming events in 2025

Armatherm staff member giving a thumbs-up at a trade show booth, with product samples, certifications, and a Net Zero Trail floor graphic in view.
Armatherm Thermal Break Articles

Armatherm announces expansion with the opening of a third office

armatherm-logo-v2
Armatherm Thermal Break Articles

Solving Thermal Bridging Challenges with Armatherm™

Close-up of engineers reviewing architectural blueprints with safety helmets and drafting tools on the table.

Get in touch

Ready to talk about structural thermal breaks?

armatherm
Request a quote